Santos CSG Compressor Station (July – December 2013)

Santos CSG Compressor station
  • Location: Fairview, QLD
  • Principal Contractor: CDJV (Clough Downer Joint Venture)
PROJEM’S SCOPE – 6 Technicians for 5 Months
Cutting and machining weld preparations on heavy wall pipe for fabrication workshop delivering pipe spools to the Santos CSG compressor stations at Fairview:
  • Use of clamshell machines to suit range from 200NB to 1200NB with wall thickness of up to 50mm.
  • Approximately 760 pipes cut and beveled

Skills

Posted on

18/07/2020